Hall Renovations

Help Shape the Future of Our Hall

The Rio Terrace Community League is planning an interior renovation of our community hall. Take a look at what’s changing, then tell us how you’d use the new space.

⏱ About 5 minutes  ·  Open until December 15, 2026

Take the Survey ↓

Why we’re renovating

Our hall is home to seniors’ programs, martial arts, skating and hockey, preschool, private rentals and more. But the inside hasn’t kept up. A 2024 infrastructure assessment found life-safety and accessibility gaps. The washrooms and kitchen are outdated, storage spills into program space, and the main hall is too large and echoey for smaller groups.

This project brings the building up to code and makes it accessible and flexible enough to serve the next generation of Rio Terrace residents.

What this project is, and isn’t

It is

  • An interior renovation within the hall’s existing footprint
  • Focused on accessibility, washrooms, the kitchen, storage and better use of space
  • Based on a concept plan developed with our project manager and current user groups, and reviewed by the City of Edmonton
  • Sized to a realistic, grant-funded budget

It isn’t

  • An expansion or a new building
  • A change to the rink or tennis courts
  • A redesign of the overall floor plan from scratch
  • Funded through membership fees

Today → Tomorrow

Here’s what’s proposed for each area of the hall. Every renovated space also gets a new ceiling, new flooring, LED lighting, new paint and updated exit signage where needed. Click any photo to enlarge it and browse the full set.

Main Hall

Today The main hall today: dropped ceiling tiles, fluorescent lights and tiled floor

Dated finishes, a low dropped ceiling and poor acoustics make the space feel tired and echoey.

Proposed Rendering of the renovated main hall with exposed trusses, acoustic baffles, LED lighting and wood-look flooring Artist’s rendering for illustration only

An open ceiling with exposed, painted trusses, acoustic baffles to reduce echo, new LED lighting and new flooring. Brighter, quieter and more flexible.

Kitchen & Canteen

Today The kitchen today: older wood cabinets, a work table and household appliances

An outdated layout that’s hard for caterers, renters and volunteers to work in.

Proposed Rendering of the renovated kitchen with new cabinets, a stainless prep table and a service window Artist’s rendering for illustration only

New cabinets and counters, a better layout, and an indoor/outdoor service window, so the canteen can serve rink and outdoor events directly.

Washrooms

Today The washroom today: older stall partitions and mosaic tile floor

Older fixtures that don’t fully meet today’s barrier-free standards.

Proposed Rendering of the renovated all-gender washroom with enclosed private stalls and a barrier-free stall Artist’s rendering for illustration only

Modern all-gender washrooms with enclosed private stalls, including a barrier-free stall.

Entrance & Foyer

Today The entrance today: a pass-through area with a bench and floor mats

A pass-through space with nowhere to put coats or gear.

Proposed Rendering of the renovated foyer with a coat room, wood storage lockers, a bulletin board and a bench Artist’s rendering for illustration only

A welcoming foyer with a new coat room and storage, plus bike racks outside.

Meeting Room

Today The meeting room space today, currently filled with stored equipment

Two small, underused rooms.

Proposed Rendering of the new meeting room with a large table, whiteboard, open ceiling and new windows Artist’s rendering for illustration only

Combined into one bright meeting room with new windows. A comfortable size for smaller groups, classes and meetings, so they don’t need the whole hall.

Storage

Today Storage today: open shelving and a storage cage full of program equipment

Scattered storage that spills into program areas.

Proposed Rendering of consolidated storage with labelled lockable cabinets and a lockable equipment cage Artist’s rendering for illustration only

Consolidated, lockable cabinets and a storage cage, so each user group has its own space and the hall floor stays clear.

Dressing Room

Today The dressing room today: concrete block walls, benches and sports gear

A worn change space for skaters and hockey players.

Proposed Rendering of the refreshed dressing room with wood benches, cubbies, hooks and new lighting Artist’s rendering for illustration only

A refreshed dressing room with new finishes and lighting.

Want the details? See the full concept floor plan.

View the Concept Plan (PDF)

Funding & timeline

The project is planned around grant funding, not membership fees. We’ll apply to the City of Edmonton’s Community League Infrastructure Program (CLIP) and the Province of Alberta’s Community Facility Enhancement Program (CFEP). Construction depends on that funding and may happen in phases. If so, each phase will leave the hall fully usable, and we’ll plan the work to keep disruption to programs as low as possible.

  • 2026Project planning, concept design and city review
  • Fall 2026 · You are hereCommunity engagement
  • Winter 2026–27Detailed design · City of Edmonton CLIP grant application (January)
  • 2027Province of Alberta CFEP grant application
  • 2027–2028Construction, depending on funding (possibly phased)

Tell us what you think

Your input helps us decide what gets done first if the work is phased, which programs and partners to plan for, and how the hall can support itself through rentals. Every response is read, and we’ll share a “What We Heard” summary on this page and in the newsletter.

Open until December 15, 2026. Can’t see the form? Open it in a new tab.

Frequently asked questions

Will this raise membership fees?

No. The project is planned around City of Edmonton and Province of Alberta grant funding.

Is the hall being expanded or rebuilt?

No. This is an interior renovation within the existing building. Structural and exterior changes are not part of this project.

Will the hall close during construction?

Parts of it may close temporarily. We’ll share the construction schedule well in advance and work with user groups to keep disruption low.

Why can’t I suggest a completely different design?

The concept plan was shaped by the 2024 infrastructure assessment, current user groups, our project manager and the City’s review, and it’s sized to fit realistic grant budgets. This survey focuses on priorities and how the space will be used, which is where community input makes the biggest difference at this stage.

Who do I contact with questions?

Email the Hall Modernization Committee at rtclhallrenovation@gmail.com.